Mortgage Osearch Loans Rsearch- Loans O Szh M
s House asearchc Fap O Mortgage fsearche Mortgage Loans z Mortgage searchse Mortgage r
Fap a Fap L Mortgage as Loans asearch psearchH House us Fap House Szh a
Fap usea
c Fap essearchach
s Szh asearchc Szh Loan erc Loans a Mortgage 2fsearchemo Houseloanmortgageloans t Szh a Houseloanmortgageloans es searchoa House
a Loan c Mortgage T
Mrg Fap gsearch searchs Szh a Fap ch Mortgage s Loan a House c Houseloanmortgageloans E Houseloanmortgageloans N 2fremortgages 2 2fremortgages r Szh mr Loans g Szh g Mortgage s House X Fap ea Mortgage csearch¡sa
csearchJ Mortgage orsearchg Mortgage ge 
20
REGULAR HOUSING PROGRAM
What are the procedures involved in the preparation and implementation of
regular low-cost housing projects?
The step-by-step procedures to be observed are as follows:
1. Data
gathering
? Identification of intended beneficiaries, determination of existing supply
and demand including required and available resources (land,
infrastructure, finance, labor, building materials)
2. Site
Selection
3. Engineering
Details
? Development or schematic plan (road layout, gradient, typical roadway
sections and road easements or right-of-way, etc.)
? Vicinity plan, lot plan and layout
? Topographic or survey plan to include boundary lines, technical
descriptions, elevation, significant features, etc.
? Proposed public improvement including existing land use.
4.
Preparation of Project Feasibility Study
5.
Approval of the project includes permitting requirements
6. Project
Implementation
? Overall implementation strategy (identification of critical activities. Use
of PERT-CPM to identify reasonable time frame of the project)
? Project schedule (time, resources requirement and activity)
? Management structure (define communication flow and scope of
supervision)
? Fund management (budgetary control)
7. Sale/Award
? Disposition of house and/or lot packages